S.T.A.E.
Cable drawing and laying cable runs
(STAE / Industry)
EXXONMOBIL
Notre dame de Gravenchon (76)
ARCELOR MITTAL DUNKERQUE
THOUROTTE SITE (OISE) (60)
TOTAL Raffinerie de Normandie
FCB LILLE

Asbestos
(STAE / Airport)
ADP ROISSY
Asbestos clearance site

Marine
(STAE / Naval)
“Cable drawing – Electrical connections” for the VSG32 patrol boat being built in Boulogne-sur-Mer for Customs
“Cable drawing” for the A34 Oasis ship

Banking
(STAE / Tertiary)
BANQUE DE FRANCE
Cable drawing,
Laying cable runs

Nuclear sites
(STAE / Nuclear)
CNPE GOLFECH
Cable drawing,
Laying cable runs
CNPE PALUEL
Power

SECRE Energy
Palais du Nouveau Siècle, Lille
(SECRE Energy / Tertiary)
Property and acoustic renovation
- Site installation
- Neutralisation, isolation and removal of electrical equipment
- Grounding system and equipotential links
- Transformer sub-station
- DP modifications
- Conduits and distribution
- Supply, installation and connection of light fittings
- Apparatus
- Emergency lighting
- Fire protection
- Sound insulation
- Access control

Musée du Louvre, Paris
(SECRE Energy / Tertiary)
Renovation of the lighting for the Hall Napoléon and the rotunda in the Passage Sully
- Cabinet modifications
- Replacing a cabinet
- Light box wiring
- Building management system cabling
- Installation of lightboxes
- Replacement of stairwell lighting
- Replacement of spotlights
- Automatic controllers
- Programming
- Monitoring

CPAM, Villeneuve d’Ascq
(SECRE Energy / Tertiary)
Building work to install a telephone support platform in Villeneuve d’Ascq (Sophia project)
Work package 2: Electricity, networks and heating
- LVDB modification
- Sectioning cabinet
- Routing
- Supply, installation and connection of light fittings
- Lighting control
- Switchgear
- Emergency lighting
- By-passes
- CTA power supply
- Computer and telephone cabling
- Fire alarms
- Intruder alarm modification and extension

CPAM, Lille
(SECRE Energy / Tertiary)
Work to reconfigure public premises (active health project)
- Removal of existing installations
- Equipotential links
- Main distribution cabinets and sectioning cabinets
- Main and secondary distribution
- Supply, installation and connection of light fittings
- Supply, installation and connection of switchgear
- Supply, installation and connection of electric heating
- Power equipment
- Fire alarms
- Computer and telephone system
- Access control
Modernisation of the fire safety system
- Replacement and installation of a fire detection system
- Supply, installation and connection of initiating devices
- Supply, installation and connection of fire detectors
- Supply, installation and connection of manual initiating devices
- Supply, installation and connection of notification devices
- Supply, installation and connection of security power supplies
- Supply, installation and connection of alarmed door holding solenoids
Servo-controlled doors with ISS access control, supply, installation and connection of cable and connector modules and supports

MATCH supermarket, Chaumon en Vexin
(SECRE Energy / Tertiary)
Construction of MATCH supermarket
Store fitting
- 500 kVa transformer sub-station
- Inverter
- Generator
- 12 kVar fixed capacitor + 31 kVaR AUTO
- Main circuit-breaker
- Link between transformer and LVDB
- Earth connections
- LV distribution board
- Sectioning cabinets
- Ground equipotential links
- Power supplies
- Interior and exterior lighting
- Fire safety and safety lighting
- Audible warning system
- Faults alarm
- Electric heating

Lycée Voltaire, Wingles
(SECRE Energy / Tertiary)
Installation of cameras
- Installation marking
- Removal of screens and recorder
- Supply, installation and connection
- LAN HR 2 TO 8 TC recorder
- 2.8 – 11.5 mm lens
- 50 m infrared projector
- LCD colour monitor
- Outdoor, vandal-proof dome cameras, including wall fittings
- HR cameras
- Wiring and power supply

Airport, LESQUIN
(SECRE Energy / Tertiary)
- Electrical distribution board
- Outdoor and room lighting
- Supply, installation and connection of switchgear
- Supply, installation and connection of a warm air curtain
- Emergency lighting
- Sound insulation
- Intrusion alarm
- Fire protection
- LVDB power supply

METRO store, Henin Beaumont
(SECRE Energy / Tertiary)
- Changes to cold room lighting
- Addition of circuit-breaker
- Wiring
- Supply and installation of sealed light fittings
- Supply and installation of IR tubes
- Supply and installation of emergency stop button
- Wine cellar lighting
- Removal and disposal of lighting structures and power supply transformer
- Supply and installation of lighting structures
- Repair of LVDB
- Car park lighting
- Removal and disposal of fluorescent light fittings
- Supply and installation of fluorescent light fittings 2x49w electronic ballast
- Checking connections and insulation of light fittings on shop sign
- Removal and disposal of bulbs on shop sign
- Supply and installation of light bulbs
- Checking connections and insulation of light fittings on lighting column
- Removal and disposal of bulbs on lighting column
- Supply and installation of light bulbs
- Cleaning MV sub-station
- Energy building management system
- Installation of configurable automatic controller
- Changes to the various LVDBs and DPs

AMF
(SECRE Energy / Tertiary)
Refurbishment of electrical installations in the
Autorité des Marchés Financiers AMF 5 building
- Site power supply, structural protection
- Removal work,
- Grounding system Distribution, cables, ducting
- Sectioning cabinets
- Access points
- Gate control cabinet
- Supply, installation and connection of isolating transformer on lift power supplies
- Supply, installation and connection of light fittings
- Supply, installation and connection of a switch with illuminated ring in the auditorium with relay to audio room
- Creation of cove lighting in BA13
- Supply, installation and connection of presence and brightness detectors

Lycée Roberspierre, Lens
(SECRE Energy / Tertiary)
Extra VDI works
- Splitter equipment, including:
- switch panel fitted with 24 cat 6a RJ45 nodes
- RJ45 shell
- optical patch panel
- connector
- Cables and by-passes
- 4-pair cat 6a F/FTP cables
- 2×4-pair cat 6a F/FTP cables
- multimode fibre
- Modification and addition of access points, including:
- 360° screened cat 6a RJ45 nodes,
- 4×2 P+G red plugs, without polarizer
- 45*45 plate,
- VGA or HDMI plug
- Supply and installation of supports and conduits
- Modifications to electrical distribution board
- Supply, installation and connection of
- junction box
- PC/screen power cable
- Switchboard diagram
- Supply and installation of a distribution cabinet
- Drilling and fire-stopping system
- Dismantling and refitting obsolete mouldings
- Dismantling and refitting suspended ceiling tiles
- Reflectometry test + acceptance testing file

Lycée Mariette, Boulogne-sur-Mer
(SECRE Energy / Tertiary)
Internet cabling and bringing computer infrastructure up to standard
- Splitter equipment, including:
- bare switch panel fitted with 24 19” cat 6a ports
- screened Cat 6a RJ45 shell
- Optical patch panel with cross-connects 12 LC monomode ports
- Simplex multimode 50/125 ST connector
- Removal of a cross-connect box
- Installation of a 19” cabinet
- Cables and by-passes
- 4-pair cat 6a F/FTP cables
- copper Cat 3 28 pairs telephone by-pass
- 50/125 OM4 multimode fibre 12 strand internal tight structure
- Points of access:
- 1 screened RJ45 node 360° cat 6a,
- 45×45 plate, 1x2P+G red plug, without polarizer
- 45×45 plate, 2x2P+G red plug, without polarizer
- 3x 360° screened cat 6a RJ45 node
- 45×45 plate, 4x2P+G red plug without polarizer
- VGA or HDMI plug
- 1x 360° screened cat 6a RJ45 node
- 1x 2P+G plug
- Supply and installation of supports and conduits
- Modifications to electrical distribution board
Reflectometry test + acceptance testing file

Centre Oscar Lambret, Lille
(SECRE Energy/ Tertiary)
Recovery room:
- Modification to wiring
Library: Creation of a washroom
- Removal and replacement of light fittings, trunking
- Supply and installation of wall-lights with detector
ANAPATH department:
- Renewal of power, computer and telephone sockets
Outside door
- Access control
Office
- Modifications to electrical installation
Radiotherapy department
- Changing lighting in CT0014 room
Imaging department:
- Site installation,
- Removal work,
- Earth connections
- Modification to existing cabinets
- Supply, installation and connection of light fittings
- Supply, installation and connection of switchgear
- Supply, installation and connection of emergency lighting
- Power and data cable runs
- Power and data cabling
- Capped power connections
- Fire alarms
- Sick call
- Access control
- Other low power supplies:
- Loud speakers
- HP wiring
- Inspection and acceptance tests

Sous Préfecture, Marne
(SECRE Energy / Local services)
Renovation and safety work on electrical installations for two buildings at the Marne Prefecture head offices
- Site installation
- Worksite power supply
- Removal of existing unit
- Covered 220 KVA generator
- Replacement of wiring to LVDB
- Screens
- Replacement of ground floor emergency exit door and fanlight
- Renovation of generator room
- Renovation of areaway
- Supply of plants for gardening department
- Training of generator operator

Engineering, detailed testing and commissioning services
(SECRE Energy / Industry)
- Steering plan – TOTAL La Chambre
- Offside studies for styrene project – TOTAL Gonfreville
- Steering plan -TOTAL Loison

SEGER Métropole
Workshop 4 Cantons, Villeneuve d’Ascq
(SEGER Métropole / Tertiary)
Extension of the garage workshop
Switching to 52 meters

Workshop 4 Cantons, Villeneuve d’Ascq
(SEGER Métropole / Tertiary)
Extension of the garage workshop
Layout of office space, high current, low current, lighting

Urban Community, Lille
(SEGER Métropole / Tertiary)
Switching to LED lighting for all the corridors of R + 8 Operation performed in operation

Belgian and METRO ticketing system
(SEGER Métropole / Transport)
Installation and wiring for Belgian ticketing system
Moving validators

Workshop 4 Cantons at Villeneuve d’Ascq
(SEGER Métropole / Transport)
Extension of the garage workshop
Switching to 52 meters
Electrical equipment gateways
Cable tray laying, pulling cables, making provision laying electrical connection boxes and accessories

Faidherbe’s bus depot (risk-sensitive site)
(SEGER Métropole / Transport)
Supply poses – 1st in France doors of approval accordions to ATEX standards

Faidherbe’s bus depot
(SEGER Métropole / Transport)
Protection of fire and gas leak, by a combination of:
From a classical detection system heads DI From thermal imaging cameras can detect a gas leak and or a fire starting.
Linear barrier for analysis and detection of gas leaks.
A management system of all the various means of monitoring to take adequate measures.

SECRE Equipements
Manufacture of cabinets
(SECRE Equipments / Wiring workshop)
CARNOT LOCK CALAIS
Replacement of LVDB + HV links
MEEF – GAS GENSET
Generator cabinet
CANDIA BOX
Cabinet outside inside
DIRECTION DES FINANCES PUBLIQUES, PARIS
1600A LVDB
Generator power cabinet
PLACOPLATRE, PARIS
Conveyor cabinet
HOSPITAL IN MARTINIQUE
Generator control cabinet
HOSPITAL VALENCIENNES
Chassis
L’OREAL LIBRAMONT BELGIUM
2500A LVDB
ADP
Worksite PC box
CONCRETE MIXING PLANT
Control desk
CHAUMECA
Automatic controller cabinet for air dryer control
Wiring for air dryer destined for Russia
Heating unit
SWIMMING POOL VALENCIENNES
Filter unit